View from Dale Ave Exterior construction site including equipment. -
View from School Street Exterior construction site including equipment and supplies. -
View from School Street Foundation of new addition. -
View from Central Grammar Exterior construction site of the north side of the 1976 building. -
Manhole and catch basin Installation in parking lot. -
Second floor in 1976 building View of opening for the new staircase. -
Second floor in 1976 building View of opening for the new reading room. -
Second floor in 1976 building View is looking towards the east. -
First floor of 1976 building View is looking towards the east. -
Ground level pump room Located under new entry. -
Ground floor in 1976 building View is looking west towards the new addition. -
Ground floor in 1976 building View is looking at east wall. -
View from Dale Ave Construction of new entry. -
View from Dale Ave Exterior construction site including equipment. -
New Addition foundation Exterior construction site including equipment. -
View from Dale Ave Exterior construction site including equipment. -
Ground floor in 1976 building Interior stripped down and construction material stored. -
Second floor in 1976 building Interior stripped down to walls and some flooring removed. Roof has been opened. -
Second floor in 1976 building Interior stripped down to walls and some flooring removed. -
View from Central Grammar Construction of new addition foundation. -
View from Central Grammar Construction of new addition foundation. -
View from Central Grammar Removal of windows on the north side of the buidling. -
View from Dale Ave Destruction of front facade, including the front porch. -
View from School Street The original structure's back wall open to the exterior. -
Footings of New Addition The start of the footings in the former parking lot. -
View from Dale Ave The interior is cleared and open to the exterior on both sides of the building. -
View of South Wing The 1913 structure cleared of stacks and open to the exterior. -
View from Dale Ave Destruction of front facade, including the front porch. -
Rainwater collection tank Installation in parking lot. -
View towards Mason Street Excavating in the parking lot. -
View from Mason Street corner Exterior construction site with some foundation walls -
View from Dale Ave Exterior construction site with workmen and scaffolding -
View from Dale Ave Exterior construction site with workmen and scaffolding -
View from Central Grammar Exterior construction site with some foundation walls, concrete mixer truck -
View from Mason Street corner Exterior construction site with some foundation walls, concrete mixer truck -
View from Mason Street corner Exterior construction site with shed and some foundation walls -
View from Mason Street corner Exterior construction site with shed -
View from Mason Street corner Exterior construction site with some foundation walls -
View from Mason Street corner Exterior construction site with some foundation walls, machinery and workmen -
View from Central Grammar Exterior construction site with workmen and trenches for foundation walls -
View from Mason Street corner Exterior construction site with dirt pile -
View from Central Grammar Exterior construction site with workmen and trenches for foundation walls -
Ground floor view Finished interior after opening - Friend Room -
Ground floor view Finished interior after opening - Children's Room -
Top floor view Finished interior after opening - Mezzanine and view of main floor -
Main floor view Finished interior after opening - Main circulation desk and book shelves -
Main floor view Interior construction site with book stacks partially filled with books -
View from Dale Ave - Central Grammar corner Exterior construction site with final landscaping -
Top floor view Interior construction site with view of both top and main floor book stacks partially filled with books -
Library Dale Ave grounds Exterior construction site with final landscaping -
Mason Street view Exterior construction site with some landscaping and workmen surveying -
Main floor stack setup Interior construction site with finished interiors and workman building shelving frames -
Dale Ave entrance Exterior construction site with some finished landscaping -
Overview from Central Grammar Exterior construction site with some finished landscaping -
Top floor view Interior construction site with finished interiors, pre-furnishings -
Top floor view Interior construction site with finished interiors, pre-furnishings -
Top floor view Interior construction site with finished interiors, pre-furnishings -
Top floor view Interior construction site with finished interiors, pre-furnishings -
Top floor view Interior construction site with finished interiors, pre-furnishings -
Top floor view Interior construction site with finished interiors, pre-furnishings -
Top floor view Interior construction site with finished interiors, pre-furnishings -
Top floor view Interior construction site with finished interiors, pre-furnishings -
Main floor view Interior construction site with finished interiors, pre-furnishings -
Main floor view Interior construction site with finished interiors, pre-furnishings -
Main floor view Interior construction site with finished interiors, pre-furnishings -
Main floor view Interior construction site with finished interiors, pre-furnishings -
Main floor view Interior construction site with finished interiors, pre-furnishings -
Main floor view Interior construction site with finished interiors, pre-furnishings -
Main floor view Interior construction site with finished interiors, pre-furnishings -
Main floor view Interior construction site with finished interiors, pre-furnishings -
Ground floor view Interior construction site with finished walls and a workman building cabinets -
Top floor view Interior construction site with finished walls and beams without light fixtures -
Library landscaping Exterior construction site from Dale Ave with machinery shaping the grounds -
Dale Ave fencework Exterior construction site with two workmen fabricating fence and built-in benches -
Ground floor view Interior construction site with partial wall and wall studs -
Top floor beam installation Interior construction site with concrete floor, lighting panels and scaffolding -
Top floor view Interior construction site with concrete floor, lighting panels and scaffolding -
Main floor view Interior construction site with concrete floor, electrical cable work, lighting panels and scaffolding -
Ground floor view Interior construction site with concrete floor, electrical cable work and wall studs -
Top floor view Interior construction site with concrete floor, electrical cable work and scaffolding -
Main floor view Interior construction site with concrete floor, electrical cable work and scaffolding -
Exterior from Dale Ave Exterior construction site with workmen painting walls -
Overview from Central Grammar Exterior construction site with scaffolding and painted walls -
Main floor view Interior construction site with concrete floor, ventilation duct work and scaffolding -
Ground floor view Interior construction site with concrete floor, ventilation duct work and scaffolding -
Second floor view Interior construction site with concrete floor, ventilation duct work and scaffolding -
Exterior from Central Grammar Exterior construction site with scaffolding and painted walls -
Exterior from Mason Street Exterior construction site with scaffolding and painted walls -
Second floor view Interior construction site with concrete floor, ventilation duct work and scaffolding -
Top floor view Interior construction site with concrete floor, ventilation duct work and scaffolding -
Ground floor view Interior construction site with concrete floor and ventilation duct work -
Top floor --- Dale Ave side Interior construction site with workmen and scaffolding -
Top floor --- Mason Street side Interior construction site with workmen and scaffolding -
View from existing library roof Exterior construction site with scaffolding and workman on roof -
Overview from Central Grammar Exterior construction site with full roof and partial walls with scaffolding -
Top window installation from Dale Ave side Exterior construction site with workmen installing clerestory windows -
Setting concrete --- top floor Interior construction site with workmen smoothing the concrete -
View of new roof from old roof Exterior construction site with workman laying wood sheathing